Unable to log in or get member pricing? Having trouble changing your password?

Please review our Frequently Asked Questions for complete information on these and other common situations.
 

Vertical Flight Library & Store

Modeling a Maintenance Free Operating Period Strategy for Future Vertical Lift

Matthew Beigh, Andrew Bellocchio, United States Military Academy
James Burgess, US Army CCDC AvMC
Daniel Schrage, Georgia Institute of Technology

October 10, 2020

https://doi.org/10.4050/F-0076-2020-16270

Abstract:
The U.S. Department of Defense has begun the acquisition of the next generation of military rotorcraft, named Future Vertical Lift (FVL), to replace its aging fleet. U.S. Army Futures Command intends to sustain FVL under a new strategy of maintenance free operating periods (MFOP). This study developed a discrete event simulation to evaluate MFOP success given component reliabilities, desired MFOP duration, and operational tempo of a battalion with thirty aircraft. The simulation compared notional FVL aircraft with improved reliability to today's fleet. Results indicated that inherent reliability alone was insufficient to achieve MFOP goals and that prognostics and diagnostics with robust information management are necessary. Sensitivity studies found the recovery effort after an MFOP was linked to the MFOP duration. Recovery downtime was tied to both the duration and operational tempo. Availability and cost improved with moderate gains in MFOP duration by eliminating unnecessary preventive maintenance but overextending the MFOP sacrificed aircraft dependability for marginally greater availability and savings.


Modeling a Maintenance Free Operating Period Strategy for Future Vertical Lift

  • Presented at Forum 76
  • 13 pages
  • SKU # : F-0076-2020-16270
  • HUMS

  • Your Price : $30.00
  • Join or log in to receive the member price of $15.00!


VFS member?
Don't add this to your cart just yet!
Be sure to log in first to receive the member price of $15.00!

 
Add To Cart

Add to Wish List

Reward Value:
(60) Member Points

Modeling a Maintenance Free Operating Period Strategy for Future Vertical Lift

Authors / Details:
Matthew Beigh, Andrew Bellocchio, United States Military Academy
James Burgess, US Army CCDC AvMC
Daniel Schrage, Georgia Institute of Technology